Skip to content

04 / Plant care

Retrofit & Upgrades

Capacity and efficiency improvements for existing water treatment plants.

Industrial process structures suited to plant upgrades

Overview

What this covers.

Debottlenecking, membrane replacement programmes, control upgrades and energy or recovery improvements — including plants another vendor built. Work starts with a survey of hydraulics, vessels and controls, then a phased plan that keeps production water available.

Applications

Where this is typically used.

  • Plants hitting capacity or recovery limits
  • Ageing membranes or controls
  • Trains installed by other vendors

What we deliver

Scope on this offering.

  • 01Site survey and gap analysis
  • 02Phased upgrades that minimise downtime

Process

How the work typically runs.

  1. 01

    Survey

    Walk the plant and record what is actually limiting it.

  2. 02

    Gap analysis

    Separate must-do work from later improvements.

  3. 03

    Phase the upgrade

    Execute in an order that keeps production water available.

Benefits

Why this specification.

  • Improve the plant you have before replacing the whole train
  • Capacity and recovery improved without a full replacement
  • Downtime planned instead of accidental
Industrial process structures suited to plant upgrades

Questions

Asked before we start work.

Can you upgrade a plant another vendor built?

Yes. We survey hydraulics, vessels and controls, then propose phased upgrades against your capacity or quality targets.

How do you limit downtime?

Work is staged — often off-shift or train-by-train — so production water is not cut longer than the agreed window.

Service desk

Need plant support? Share your plant type and issue.

Tell us the plant type, feed water and the issue. We will come back with installation, AMC, CIP, chemistry or parts — whichever the site actually needs.